Blog · Compliance · 6 min read
A Preventive Maintenance Schedule for BC Stratas
ManageStrata Team
November 8, 2026

The roof leak starts somewhere above Unit 304 on a Saturday in November. By Monday the council is calling restoration companies, the owner is asking why nobody noticed the flashing, and someone finds a minute from three years ago where a contractor said the membrane had about five years left. Nobody carried that note forward.
That is the tension in almost every expensive strata repair: the information existed, but it did not live anywhere a future council would look. A preventive maintenance schedule is simply the fix for that — a written, shared calendar of what gets checked, how often, by whom, and where the result is recorded.
This post covers what the law actually obliges your strata to maintain, which intervals come from outside the Act, how a depreciation report feeds the schedule, and how to pay for the work without a surprise levy.
Start with who is responsible for what
Before you can schedule anything, you need to know whose item it is. Under the Standard Bylaws, the strata corporation must repair and maintain common assets, common property that is not limited common property, and limited common property — though for LCP the duty is restricted to repair and maintenance that in the ordinary course occurs less often than once a year, plus a listed set of items no matter how often they come up: the structure of a building, the exterior, chimneys, stairs, balconies and other things attached to the exterior, exterior or common-property-facing doors, windows and skylights, and fences, railings and similar structures enclosing patios, balconies and yards. In a strata plan that is not a bare land plan, the corporation also maintains that same list of items within a strata lot (Standard Bylaw 8).
Owners carry the rest. Standard Bylaw 2 requires an owner to repair and maintain their strata lot, and to maintain limited common property they have the use of, except where the bylaws make it the corporation's job.
This is bylaw-dependent. Many strata corporations have amended or replaced these bylaws, and some have taken on responsibility for items the Standard Bylaws leave with owners. Read your own registered bylaws alongside your strata plan before you assign a line item to anyone. Our post on strata maintenance planning and work orders goes deeper on turning that split into assignable tasks.
Build the schedule in four layers
1. Life-safety systems, at their own intervals. Fire alarms, sprinklers, extinguishers, emergency lighting and standpipes are each inspected, tested and maintained at the interval the BC Fire Code sets for that specific system — monthly, annually, or otherwise. There is no single "annual fire inspection" of the whole building in either the Act or the Fire Code, and building a schedule around one is how monthly items get missed. Keeping these systems in order is part of the corporation's common property repair and maintenance duty. See Fire and life-safety inspections for BC stratas for how to lay those intervals out.
2. Cyclical building items. Roofing, envelope and sealants, gutters and drainage, elevators, boilers and HVAC, backflow preventers, parkade membranes, landscaping and irrigation. Frequencies here come from manufacturer specifications, consultant recommendations and contract terms — not from the Act.
3. Depreciation report items. A depreciation report, prepared by a qualified person, inventories the major components and their expected remaining life. Strata corporations of five or more lots must obtain one: by July 1, 2026 in Metro Vancouver, the Fraser Valley and the Capital Regional District, and by July 1, 2027 elsewhere in BC, renewing every five years. The provincial requirements page sets out the details.
4. Planning obligations with deadlines. Stratas of five or more lots also need an electrical planning report by December 31, 2026 (Metro Vancouver, Fraser Valley, Capital Regional District) or December 31, 2028 elsewhere. Stratas under five lots instead need an EV-charging approval process by December 31, 2026.
Questions councils actually ask
Do we need an owners' vote to do scheduled maintenance?
Not usually for routine work funded through the operating budget. Spending from the contingency reserve fund normally needs a 3/4 vote, but a majority vote is enough in five cases, including obtaining a depreciation report and carrying out repair, maintenance or replacement recommended in the most current depreciation report. The CRF page sets out all five, plus the limited circumstances where spending needs no approval at all — including where there are reasonable grounds to believe an immediate expenditure is necessary to ensure safety or prevent significant loss or damage.
Can we fund upkeep without special levies?
Partly. Since November 1, 2023, every strata corporation and section must budget a minimum annual CRF contribution of at least 10% of the total budgeted operating fund contribution, determined after considering the most recent depreciation report. A funded CRF plus a majority-vote path for depreciation-report work is the practical alternative to a levy.
An owner wants to upgrade something themselves. Does that go on our schedule?
Only after it is approved. Alterations to common property, limited common property or the listed parts of a strata lot require the strata corporation's written approval under the Standard Bylaws — a council decision, not a vote at a general meeting. The condition the Standard Bylaws authorise is the owner's written agreement to take responsibility for the expenses relating to the alteration. A 3/4 vote is additionally required only where the work is a significant change in the use or appearance of common property. Accessibility-related requests have their own layer; see accessibility and the duty to accommodate.
What a healthy strata does about it
Prevention is cheaper than repair and calmer than a levy — but only if the schedule outlives the council that wrote it. A healthy strata keeps the maintenance calendar, the inspection reports, the warranties and the contractor history in one place the whole council can see, and carries forward every "about five years left" note into a dated task rather than a buried minute.
Practical habits worth copying:
- Put the next 12 months of scheduled items in the meeting package, with status, so owners see upkeep before they see an invoice.
- Record who did the work, when, and what they found — not just that it was done.
- Review the schedule against the depreciation report each budget cycle.
- Keep reports where a future council can retrieve them; tools like SearchStrata can help a council use AI to make sense of years of accumulated documents.
ManageStrata exists for that continuity: the council or the management company can change, but the documents, minutes, votes and books belong to the corporation and stay with it, and council can export a full copy at any time.
This article is general information about BC strata law, not legal advice; verify against the current Strata Property Act and Regulation or consult a BC strata lawyer.
General information, not legal advice. This article explains British Columbia strata law in general terms. The Strata Property Act and its regulations change over time and apply differently to each strata corporation. Confirm details against the current legislation or consult a qualified strata lawyer before acting.
Frequently asked questions
- Does the Strata Property Act require a written preventive maintenance schedule?
- The Act does not prescribe a particular maintenance schedule document. What it creates is a duty to repair and maintain, split between the corporation and owners under the bylaws, and a requirement for most strata corporations of five or more lots to obtain a depreciation report from a qualified person. A written schedule is the practical way councils meet those duties and show owners they are being met — but its contents and format are up to each strata.
- Who decides how often the roof or boiler gets inspected?
- Those intervals come from outside the Strata Property Act — manufacturer specifications, consultant or engineer recommendations, service contracts, and the depreciation report. Fire and life-safety systems are different: alarms, sprinklers, extinguishers, emergency lighting and standpipes each follow the interval the BC Fire Code sets for that system, which may be monthly, annual or otherwise.
- Can the council spend contingency reserve fund money on depreciation-report repairs without a 3/4 vote?
- Repair, maintenance or replacement recommended in the most current depreciation report — of common property, common assets, or the portions of a strata lot the strata has taken responsibility for — is one of five cases where CRF spending needs only a majority vote. Any other CRF expenditure needs a 3/4 vote. Separate rules allow limited spending without approval, including where an immediate expenditure is necessary to ensure safety or prevent significant loss or damage.
Keep reading
Free guide · 18 pages
Your first term on the strata council
New to the council, or handing the job to someone who is? Ten short chapters on what a BC council actually does, and the deadlines it can’t miss.
A few notes a year on running a strata
Deadlines that catch councils out, what changed in the rules, and what we shipped. Unsubscribe in one click, any time.
Run your strata with confidence
ManageStrata tracks your compliance deadlines, AGMs, and finances — with AI that drafts the work and you approve it. Self-managed or with a manager, the record stays with your corporation. Free up to 4 lots.
Start free