# Buildings

> Record each of your buildings — its address, age, envelope and systems — by typing it, filling it in from the registry, or reading it out of your own documents.

Source: https://managestrata.ca/docs/property/buildings

The lot register says who owns what. This screen says what the buildings themselves are: when each one went up, how tall it is, what it's clad in, what's on the roof, and whether the envelope has been rainscreened or repaired. Owners, buyers, insurers and contractors ask a council these questions constantly, and the answers are usually buried on the first page of a depreciation report.

**Settings → Building**. Council and managers only.

> **Bylaws aren't on this screen**
>
> This screen holds what can differ from one building to the next. What the
> corporation decides once for everybody — pets, rentals, smoking, what the strata
> fee covers, amenities and parking — is under
> **Settings → Corporation**, in
> [Bylaws & shared facilities](https://managestrata.ca/docs/account/corporation-settings#bylaws-and-shared-facilities).

## One card per building

Many strata plans cover more than one civic address — a townhouse complex, a tower with a separate podium, a development built in phases. So this is a **list of buildings**, each with its own card and its own answers. A complex whose first phase was reclad and whose second was not has two different answers about rainscreen, and one form for "the building" could only record the wrong one.

To add one, type its street address (and city, if you like) under **Add another address** and press **Add building**. The rest of its details go on its own card once it exists.

To remove one, use the **Remove** button at the foot of its card. It's offered only when you have more than one building — a corporation always keeps at least one.

## Three ways to fill it in

You can use any mix of these. Whichever you use, nothing is saved until you press a button.

### 1. Type it

Each card is a form. Every field is optional — fill in what you know, leave the rest, and press **Save this building**.

### 2. Fill in from the registry

If your strata plan number is on the Corporation tab, the screen offers **Fill in from the registry**. The SearchStrata registry already knows the civic addresses filed under many BC plan numbers, and for some buildings their year built, storeys, construction, roof and rainscreen too.

Pressing it:

- **adds any address you don't have yet**, as a new card;
- **fills in empty fields** on the buildings you do have, where the registry knows the answer;
- **never overwrites anything you've entered.** Where you and the registry both have a value, yours stands — you're the source of record for your own building.

A notice then says what happened, for example *2 addresses added, 1 building filled in*. For a very large complex, only the first 25 buildings come back with details; the rest arrive as addresses for you to complete.

> **Press it first**
>
> If you have more than one address, this saves typing them in — and it matches
> each card to its record in the registry, which matters if you later choose to
> share (see below).

If it can't help, it says why instead of failing quietly:

| Message | What it means |
| --- | --- |
| *Add your strata plan number on the Corporation tab first* | The registry finds your buildings by plan number. |
| *…doesn't look like a BC strata plan number* | Check it against your Form B. BC plan numbers carry a district prefix, like *EPS3421* or *LMS2165*. |
| *The registry has no record for … yet* | Genuinely not there. Add your buildings by hand; sharing them is how the registry gets a record. |
| *We couldn't reach the registry just now* | Try again later. Nothing about your buildings was changed. |
| *Looking your corporation up isn't switched on yet* | Not something you can fix. Add your buildings by hand; they'll be matched up later. |

### 3. Read from your documents

Each card has a **Read from documents** button. It searches the corporation's [document library](https://managestrata.ca/docs/documents/library) — a depreciation report opens with a building description, so that's usually where the answers are — and proposes values for the year built, storeys, construction, roof, rainscreen and address.

Each proposal is checked against the page it cites. A value the read can't match to the wording on that page is left out rather than offered, and the card says how many were. For the year built, storeys and the address fields the check is stricter: the value itself has to appear on the cited page (*a four-storey building* counts as stating 4 storeys).

  1. **Press Read from documents on the building's card**

   The read is for that one building. If your documents describe several
   buildings, read each card separately.
  1. **Check each proposal against its source**

   Every proposal names the document and page it came from, as a link. Open it
   — a sentence about one elevation of one phase is not necessarily true of
   this building.
  1. **Tick the ones that are right, then press Use the ticked values**

   Only ticked values are written, and only to the fields they name. Anything
   you leave unticked keeps whatever the field already held.

Values the documents don't state plainly — "circa 1970s", "probably rainscreened" — are left out rather than guessed at. If nothing comes back, the card says so: *Nothing to read yet* means no documents are uploaded or indexed, and *Nothing stated outright* means the documents don't say it clearly enough. Either way, type the answers in.

A read uses one [AI action](https://managestrata.ca/docs/ai/ai-actions). Like every AI feature here, it only proposes — [a person decides](https://managestrata.ca/docs/ai/how-ai-works).

## What each card holds

| Field | What to put |
| --- | --- |
| **Street address, City, Postal code** | The civic address of this building |
| **Year built** | The year it was originally built — not the year it was last renovated |
| **Storeys** | Storeys above ground. Parkade levels are not storeys |
| **Structure** | The structural system, one answer — wood frame, concrete and so on |
| **Exterior cladding** | Tick every finish that's on the building |
| **Roof material** | What the roof is made of, not its shape. Tick more than one if there's more than one |
| **Rainscreen** | Full, partial or none — or leave it as *Not recorded* |
| **Envelope remediation** | What has been *done* to the envelope: not remediated, partially, fully, in progress, or approved and planned |
| **Year remediated** | When that work was done |
| **Levels below grade** | Parkade and basement levels |
| **Building form, Foundation** | Low-rise, townhouse, high-rise…; slab, crawlspace, full basement, piles… |
| **Elevators** | Passenger elevators. Zero is worth recording in a building of five storeys or more |
| **Windows, Balconies and decks, Heating, Cooling** | Tick everything that applies — a partly re-glazed building has both kinds of window |

The choices in these lists come from the registry, so they match what it accepts. If the registry can't be reached, the screen falls back to its last copy of the lists, and the Rainscreen hint says the date they were last confirmed.

**Rainscreen and remediation belong together.** Rainscreen records the wall as it stands today; remediation records what was done to it. An older building with a full rainscreen was almost certainly remediated, and a buyer reading either one alone can draw the wrong conclusion.

The form refuses one combination: a **year remediated earlier than the year built**. A repair can't predate the building.

### Blank means "not recorded"

Every field starts blank, and blank never means "no" or "none". It means nobody has said. Where the true answer is none — no elevators, no rainscreen — record it; leaving it blank is a different statement.

### Older free-text answers are kept

Construction and roof used to be free-text boxes. If something you typed then doesn't match any of today's choices, it's listed under the question as *Also recorded here* and kept every time you save. It is **not** shared with the registry. Tick the nearest option if one fits.

## Sharing with the registry

Nothing on this screen leaves ManageStrata unless your council chooses to share. That choice is one checkbox — **Share these facts with the public strata registry** — at the foot of the bylaws form on the Corporation tab, and it covers the corporation and all its buildings. [How sharing works →](https://managestrata.ca/docs/account/corporation-settings#sharing-with-the-registry)

Each card says whether that building can be shared:

- **Matched to the registry — its facts can be shared.**
- **Not matched to the registry yet** — its cladding, roof and rainscreen stay here. Press **Fill in from the registry** to match it.

After a save, the banner at the top says what happened — for example *Saved. 2 facts were offered to the public registry. 3 stayed here because their buildings are not matched to a registry record yet*, or that sharing is off and nothing was sent. When everything already went on an earlier save, it simply says *Changes saved.*

> **Removing a building doesn't unshare it**
>
> Removing a building takes it off your corporation. Anything already shared about
> it stays with the registry — to change a public record, ask the registry.

Every add, save, removal, registry fill-in and accepted document read is recorded in the [audit trail](https://managestrata.ca/docs/account/corporation-settings#audit-trail).