# Contingency reserve fund

> The savings account for big repairs — what has to go in, how ManageStrata projects whether it's enough, and how to close a gap before it becomes a levy.

Source: https://managestrata.ca/docs/compliance/reserve-fund

Your corporation runs two funds and they must not be mixed.

**The operating fund** pays this year's recurring bills — insurance, landscaping, utilities, management, small repairs.

**The contingency reserve fund (CRF)** — called a reserve fund outside BC — pays for big, infrequent replacements: the roof, the elevator, the boiler, the parkade membrane.

> **Keep them separate**
>
> Money moves *into* the reserve fund as a planned contribution and comes *out*
> only for what the reserve is for. Paying an operating shortfall out of the
> reserve solves this month's problem by creating a much larger one later — and in
> most provinces it is restricted by legislation. ManageStrata accounts for the two
> funds separately for exactly this reason, and has a button for moving money into
> the reserve but none for moving it back to operating: that's a withdrawal, and
> in BC it needs a 3/4 vote. See [finances overview](https://managestrata.ca/docs/finances/overview).

## What has to go in

In **British Columbia**, every budget must include a CRF contribution of at least **10% of the total amount budgeted as the contribution to the operating fund** for that year. Since **1 November 2023** this applies **regardless of how much is already in the fund** — the old rule that let a corporation stop contributing once the CRF passed 25% of operating expenses no longer exists. ManageStrata uses that figure as the floor in its [compliance check](#the-compliance-check), and shows an adopted budget whose reserve lines fall below it as **Action needed**.

Note the base: the budgeted contribution to the operating fund, not total operating expense and not a percentage of the CRF balance.

> **The minimum is a floor, not a target**
>
> Almost no building is adequately funded at the statutory minimum. The number that
> matters is the one your [depreciation report](https://managestrata.ca/docs/compliance/depreciation-report)
> recommends, which is derived from your actual components and their actual
> remaining life.

In **Alberta** and **Ontario**, the required contribution comes from the funding plan adopted with your reserve fund study rather than from a fixed percentage.

## The reserve projection

On **Assets & reserve study**, the **Contingency Reserve Fund (CRF) projection** works from two things:

1. **What your components will need**, and when — from your [component registry](https://managestrata.ca/docs/property/assets-and-reserve-study).
2. **What you currently hold** in the reserve.

It adds up the replacement costs coming due within the planning horizon — five years in BC — takes away today's balance, and spreads what's left over those years. That's the study-based recommendation — shown as **Annual need** and **Recommended/yr** on the assets page, and as **Recommended from your study** on the budget.

Remaining lives are counted from the year they were written down, so a component your report expected to replace two years ago counts as **needed now**, not as years away. An old report therefore pushes the recommendation up. See [when a component is due](https://managestrata.ca/docs/property/assets-and-reserve-study#when-a-component-is-due).

*Illustration — ManageStrata · Budget — reserve line:*

    - Reserve (CRF) — In this budget — $61,200.00
    - Recommended from your study — $96,400.00 — $35,200.00 short of it

The recommendation appears in two places: on the assets page, and on the [budget](https://managestrata.ca/docs/finances/budgets#the-reserve-line-and-the-recommendation) beside the reserve line you're setting, with the shortfall in dollars.

## The compliance check

The **CRF contribution planning** item on [Compliance](https://managestrata.ca/docs/compliance/compliance-calendar) reads the reserve lines in your **adopted budget** — not the figure on the assets page, and not a draft.

| Your adopted budget | Status |
| --- | --- |
| No adopted budget | Flagged — *No CRF contribution set* |
| Reserve lines meet the recommendation — the larger of the study-based figure and the statutory minimum | **On track** |
| Meet the statutory minimum but fall short of the study-based figure | Flagged |
| Below the statutory minimum — including a reserve contribution of zero | **Action needed** |

The item has no date of its own — it's revisited each budget cycle — so when it's flagged it sits under **Needs a date** in the list, and when it's on track it sits under **Ongoing**. Either way its card ends in **Go to Budget**.

"Nobody has set a contribution" and "the contribution is zero" are different findings, which is why the first is flagged and the second is **Action needed**.

> **The projection is only as good as the component list**
>
> Seed it from your depreciation report rather than typing it from memory. A
> projection built on three components will look wonderfully healthy and tell you
> nothing.

## Closing a gap

When the projection says you're short, there are four levers, and most councils use a combination.

  1. **Raise the annual contribution**

   The least painful option and the one owners resent least, because it's
   gradual and predictable. Build it into next year's
   [budget](https://managestrata.ca/docs/finances/budgets).
  1. **Re-time the work**

   Some components can be maintained rather than replaced, or deferred a few
   years on professional advice. Deferral is a decision, not a saving — record
   it as such.
  1. **Raise a special levy**

   A one-off charge to owners for a specific project. Sometimes unavoidable, and
   much easier to pass when owners have seen the projection first. See
   [special levies](https://managestrata.ca/docs/finances/special-levies).
  1. **Borrow**

   Some corporations finance major work. Understand the total cost and the
   approval your bylaws and legislation require before going near it.

## Recording contributions and spending

**Contributions in.** Strata fees arrive whole in the operating fund — a fee is billed as one invoice, because that's what a [Form B](https://managestrata.ca/docs/forms/strata-forms) certifies as the lot's monthly fee — so the reserve's share has to be moved across.

**Finances → Budget → Contingency Reserve Fund (CRF) contribution** does it a month at a time, once the budget is adopted. It shows what was adopted for the year, how much has moved (out of twelve months), and how much is still to go, so a contribution that stalled in March is visible in April rather than at year end. **Budget vs actual** on the same page measures the reserve the same way — the contribution against what has been moved in, with spending from the reserve listed separately rather than netted against it. [Budgets →](https://managestrata.ca/docs/finances/budgets#the-reserve-in-budget-vs-actual)

**Any other amount** — a surplus the AGM voted into the reserve, a one-off top-up, or a corporation with no budget in ManageStrata — goes across with **Finances → Transfer to reserve**, which previews both funds before and after. It runs one way only: operating into the reserve. [Transfer to reserve →](https://managestrata.ca/docs/finances/payments-and-expenses#any-other-amount)

> **An adopted contribution is not a contributed one**
>
> Until the transfers are made, the CRF line exists only in the budget document.
> The projection below, the reserve balance on a Form B, and s.94's question about
> whether the reserve is adequate are all answered from the fund — not from what
> the budget said would go into it.

**Spending out.** Record a reserve expense against the reserve fund, not the operating fund. Raise the work as a [work order](https://managestrata.ca/docs/property/maintenance) linked to its component — the wrench on the component's row does this — and once it's done, correct the component's remaining life. That's what keeps the next projection accurate, because a roof replaced this year shouldn't still be counted as due.

## What owners should look at

Any owner can see the corporation's compliance status. Two numbers tell most of the story:

- **the reserve balance** against the recommended contribution level, and
- **whether the depreciation report is current**.

A healthy reserve with a current report means fewer surprises. A thin reserve with an expired report means an owner should be asking questions at the AGM.

## Common questions

**Can we spend the reserve on an emergency repair?** In BC, yes and with no vote at all — s.98(3) permits immediate expenditure necessary to ensure safety or prevent significant loss or damage, from either fund. Record why it met that test, and revisit the projection afterwards. For non-emergency spending the answer is more precise than "check your Act":

| Situation | Approval needed |
| --- | --- |
| CRF expenditure, generally | **3/4 vote** at an AGM or SGM (s.96(a)) |
| CRF expenditure for repair, maintenance or replacement **recommended in your most current depreciation report**, for something the corporation is responsible for | **Majority vote** (s.96(b)) |
| Immediate expenditure necessary to ensure safety or prevent significant loss or damage | **No vote** — either fund (s.98(3)) |
| Unapproved, non-emergency operating expenditure | Capped at the **lesser of $2,000 and 5%** of the annual operating-fund contribution (s.98(2)) |

**We've never had a reserve — where do we start?** Get a [depreciation report](https://managestrata.ca/docs/compliance/depreciation-report), see what it says you need, and set a contribution level you can actually sustain. Starting late is common; starting never is what turns into a six-figure levy.

**Do we need a separate bank account?** In BC, not necessarily. Section 95 requires CRF money to be held in a savings institution in BC (or invested as the regulations permit) and to be **accounted for separately** from operating money — a single account with separate accounting satisfies the Act. ManageStrata tracks the funds separately either way, which also makes [bank reconciliation](https://managestrata.ca/docs/finances/bank-reconciliation) much easier if you do hold two accounts.