# Compliance

> One page listing every statutory obligation your corporation has, grouped by what to do about it, with a calendar view and reminder emails so nothing lapses quietly.

Source: https://managestrata.ca/docs/compliance/compliance-calendar

Compliance is the reason most councils sign up. It answers the question that keeps volunteers awake: *what are we supposed to have done by now, and have we done it?*

Go to **Compliance**.

## How to read it

The top of the page counts what needs doing, by kind — *1 action needed · 2 due soon · 4 need a date* — and each count jumps to its group. With nothing outstanding it reads **Nothing needs attention right now**. Beneath the counts, **Next deadline** is the nearest unfinished obligation that has a real date, overdue ones first. Click it to open that item.

*Illustration — ManageStrata · Compliance:*

    - Insurance renewal — 2 March 2026 · 230 days overdue — Action needed
    - Depreciation report — 31 December 2026 · in 74 days — Due soon
    - Annual General Meeting — No AGM on record — Needs a date
    - Annual budget approval — 22 March 2027 · in 155 days — On track

**List** and **Calendar**, under the counts, switch between two layouts of the same obligations.

**List** is the default. Every obligation, whatever year it falls in, sorted into what to do about it:

| Group | What's in it | What to do |
| --- | --- | --- |
| **Action needed** | Late, or not met. Most overdue first | Start here |
| **Due soon** | A real date inside the reminder window | Start it — on a depreciation report that means *engage a provider*, not *wait* |
| **Needs a date** | Nothing on record to count down from | Add the date, and the item starts tracking |
| **Coming up** | On track, with a date | Nothing yet |
| **Ongoing** | Duties with no single deadline | Keep them current |

**Done** and **Not applicable** are folded away at the bottom, so the list reads as what's left to do.

Each card shows the date as a date — *22 October 2026 · in 4 days* — what the item is about, and ends with its next step: **Add the date** where a date is missing, **Go to Meetings** or **Go to Budget** where the record that decides it lives elsewhere, and **Details and actions** otherwise.

**Calendar** (**Compliance → Calendar**) shows one year at a glance, with arrows to move between years — a month strip on a phone. Each marked day opens its obligation. A year with nothing dated in it says so, and names the years that do have dates. Ongoing items have no day to sit on, so the calendar counts them and points you back to the list.

> **Due soon is a starting gun, not a warning**
>
> Several obligations take months of lead time. A depreciation report needs a
> qualified provider, a site visit and a report — often three to six months. The
> item turns **Due soon** early enough to actually finish, which is why it can look
> alarmist for something "not due until next year."

## What appears on it

The list is generated from your **province's rule set** and your corporation's own facts — your lot count, your fiscal year, and what you've already recorded. It typically includes:

- the reserve-fund report your province requires — in BC, the [depreciation report](https://managestrata.ca/docs/compliance/depreciation-report);
- [reserve fund contribution planning](https://managestrata.ca/docs/compliance/reserve-fund);
- the Annual General Meeting;
- the annual insurance review;
- in BC, the electrical planning report;
- the [tracked duties](https://managestrata.ca/docs/compliance/tracked-duties) you've switched on — fire inspection, elevator inspection, financial statements, budget approval, council minutes, bylaw filing.

Obligations that don't apply are left off, or folded under **Not applicable**. A four-lot BC corporation won't be asked for a depreciation report, because the requirement starts at five lots.

## Where the dates come from

You don't type most of these dates. Compliance reads them from the records ManageStrata already keeps:

- **The AGM** — the next AGM scheduled in [Meetings](https://managestrata.ca/docs/meetings/running-a-meeting) and not yet held sets the due date. With none scheduled, it's a year after the last one held. If the scheduled date has passed and the meeting wasn't marked held, the item says so — record it in Meetings.
- **Annual budget approval** — done once the budget for the fiscal year that AGM adopts is adopted on the [Budget](https://managestrata.ca/docs/finances/budgets#when-the-owners-adopted-it) page, as of the date the owners adopted it. Until then it falls due on the AGM's date. The fiscal year is the one in force six months after the meeting, so an AGM held late in the year adopts next year's budget. **Go to Budget** opens that year's budget at the adopt step, even if it hasn't been started yet.
- **Financial statements** — go out with the AGM notice, so they're due when the notice is: the notice period plus the deemed-receipt days before the meeting (in BC, 18 days before the meeting).

A date typed in **Settings → Compliance** still counts where no record decides the item — a budget approval date, say, when no budget for that year has been adopted.

### Needs a date

An obligation Compliance can't date is still an obligation, so it stays on the list under **Needs a date** — neutral, with a calendar icon, rather than disappearing or reading as fine:

- **AGM** — with no AGM on record, it asks you to record the last one in Meetings or schedule the next. **Go to Meetings** takes you there.
- **Insurance renewal** — with no renewal date, it asks you to add it. **Add the date** opens the item, where you save it.
- **Budget approval and financial statements** — with no AGM to follow, they ask you to schedule the AGM in Meetings.
- **CRF contribution** — this one never has a date. With no adopted budget it reads *No CRF contribution set*, and **Go to Budget** takes you to set it. See [contingency reserve fund](https://managestrata.ca/docs/compliance/reserve-fund#the-compliance-check).

> **Why Needs a date isn't Due soon**
>
> An item with no date has nothing to count down to, so the fix is to add the
> date, not to hurry. Once it has one, it moves into the group its date puts it in.

## Your regional district

BC phases both the **depreciation report** and the **electrical planning report** by regional district: Metro Vancouver, the Fraser Valley and the Capital Regional District have earlier deadlines than the rest of the province. Both are read from one setting — **Settings → Compliance → Regional district**. Each item names the region its date came from.

Until you set it, Compliance shows the **later** date for each rather than calling you overdue on a deadline that may not be yours — and the item says so and names the setting. But the later date is only a safe guess while the earlier one is still ahead. Once the earlier regional deadline for the depreciation report has passed, a corporation with no report on file and no region set is shown **Due soon**, not **On track**, with a line naming the deadline that has passed. **Action needed** is never softened to Due soon.

> **Set the region**
>
> It takes a few seconds and it's the difference between the right date and a
> guess. If you're in Metro Vancouver, the Fraser Valley or the Capital Regional
> District, an unset region can be hiding a deadline you've already missed.

## Clearing an item

You clear a compliance item by **recording the underlying thing**, not by ticking a box. That is what keeps the page honest.

  1. **Open the item**

   Click through from the list or the calendar for the item's own page — the
   rule behind it, the dates, what recording it requires, and its history.
   Where the record lives elsewhere — the AGM in Meetings, the budget on the
   Budget page — the card's **Go to Meetings** or **Go to Budget** takes you
   straight there instead.
  1. **Record the report or the event**

   **Record report** for a depreciation or electrical planning report,
   **Save renewal date** for insurance, **Log as done** for a duty. Enter the
   date, and attach the document where there is one.
  1. **Watch it recalculate**

   The item moves to **Done** or **Coming up**, and the *next* deadline is calculated from the date you
   entered. A BC depreciation report recorded today sets the next one five
   years out.

> **Record the date the work happened**
>
> Not the date you got round to entering it. Every following deadline is
> calculated from what you type here, so a recording date instead of a report date
> quietly shifts the whole cycle.

## Reminder emails

**Settings → Compliance**. Once on, the council is emailed at each of these milestones before a deadline:

| When | Why that one |
| --- | --- |
| **180 days** | Far enough out that commissioning a depreciation report is still an ordinary decision |
| **90 days** | Time to get it on a council agenda |
| **30 days** | Time to act |
| **7 days** | Last chance to arrange anything |
| **The day it falls due** | The last day the duty can still be discharged on time |

After that, once a month for as long as it stands overdue, stopping after a year.

This is the highest-value setting in the product. Councils turn over, secretaries change, and the page only helps if someone looks at it — the emails make sure someone does.

> **A missed morning is picked up the next day**
>
> The reminders work in **milestones reached**, not in exact dates. A corporation
> first tracked eighty days before a deadline has passed both the 180 and the 90,
> and is owed one email about the 90 — not two on its first morning. And if the job
> doesn't run one day, the milestone is still reached the next, so the reminder
> arrives late rather than never. Nobody is written to twice about the same
> milestone, and filing the report starts the next cycle cleanly.

An obligation with no date on it has nothing to count down to, so it stays a standing item on the list rather than becoming mail that says "at some point". That includes the AGM and insurance items under **Needs a date**: no reminder goes out until you record the date they need.

## What owners see

Compliance isn't in the owner menu — it's the council's work list, and an owner has nothing to do on it. The page still opens for an owner who goes to its address: the same list and calendar, read-only, with **Details** on each card in place of the next step. Reserve health is exactly what an owner should be able to check before voting on a levy or selling their lot.

## When Compliance and reality disagree

Compliance encodes the **statutory** floor for your province. Two situations put it out of step with your building:

**Your bylaws are stricter.** If your bylaws demand an annual review where the Act says three years, follow your bylaws. Add it as a [tracked duty](https://managestrata.ca/docs/compliance/tracked-duties) so the list reflects your actual obligation.

**Your situation is unusual.** Phased developments, mixed-use corporations, sections, and buildings mid-litigation can all have obligations the general rule set doesn't model. Use it as a floor, not a ceiling, and check with your lawyer.

> **It tracks; it doesn't perform**
>
> Recording a depreciation report in ManageStrata does not produce one. You engage
> a qualified provider, they deliver the report, you record it here and upload it.
> The software's job is to make sure you know it's coming and can prove it was done.
